Access the plumbing plan review fee calculator.

Water distribution and drain, waste and vent systems, including interceptors, separators, or catch basins:

  • 25 or fewer drainage fixture units, $150;

  • 26 to 50 drainage fixture units, $250;

  • 51 to 150 drainage fixture units, $350;

  • 151 to 249 drainage fixture units, $500;

  • 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum or $4,000; and

  • $70 per interceptor, separator, or catch basin

Building sewer service only

$150

Building water service only

$150

Building water distribution system only, no drainage system

$5 per supply fixture unit or $150 whichever is greater

Storm drainage system

  • a minimum fee of $150 or:

  • (i) $50 per drain opening, up to a maximum of $500; and

  • (ii) $70 per interceptor, separator, or catch basin

Manufactured home park or campground

  • 1 to 25 sites, $300;

  • 26 to 50 sites, $350;

  • 51 to 125 sites, $400

  • more than 125 sites, $500

Revision to previously reviewed or incomplete plans

Review of plans for which we have issued two or more requests for additional information, per review, $100 or ten percent of the original fee, whichever is greater.

Proposer-requested revision

  • with no increase in project scope, $50 or ten percent of original fee, whichever is greater; and

  • with an increase in project scope, $50 plus the difference between the original project fee and the revised project fee.